Long Island Power Authority Long Island Smart Energy Corridor

Technology Type Lead-acid Battery
Rated Power 8 kW
Duration at Rated Power (HH:MM) 0:15.00 / 0.00
URL More about Long Island Power Authority Long Island Smart Energy Corridor
Twelve sealed absorbed glass mat (AGM) lead acid batteries planned for demonstration of storage in the residential demonstration model at Farmingdale; 60 Amp, 720 W, 12 V. The Long Island Power Authority (LIPA) is teaming with Stony Brook University and Farmingdale State College to create a Smart Energy Corridor located along Route 110 in Melville, Farmingdale, and South Huntington, New York. The demonstration project will integrate advanced metering infrastructure (AMI) technology with automated substation and distribution systems to reduce peak demand and energy costs while improving the ability to identify and respond to outages. AMI will be installed at 2,338 consumer locations, 1,488 will be residential. Data collectors will be installed along the Corridor to facilitate network communications. LIPA will install digital control and communications devices on 51 capacitor banks and will also install devices that automate monitoring and control of 18 overhead switches and 6 underground switches. A key aspect of this project is to evaluate the impact of a range of variables on customer behavior and consumption, including an alternative tariff structure, provision of varying levels of information and analytical tools, and outreach and energy automation for a sample of participating customers. Demonstration projects at the Farmingdale campus will include live residential and commercial models showing how intelligent devices can enable customers to understand and control their usage and integrate distributed renewable energy. Farmingdale will also provide training and education to students, technicians, and businesses as well as outreach to the community. Stony Brook University will investigate cyber security issues, research load forecasting and modeling techniques that leverage Smart Grid data, and develop tools to help customers better visualize and understand their energy usage.
This data has been validated by project staff through a review of publicly available information about the project, and verified by the project owner. Information is accurate as of 2016-04-29.
Project Status
Status Operational
Commissioning On 05.02.2010
Project Includes Multiple Systems No
Siting
Location

333 Earle Ovington Boulevard
Uniondale, New York 11553-3606
United States

ISO/RTO NYISO
Utility Long Island Power Authority (LIPA)
Utility Type Public Owned
Paired Grid Resource
Project Includes Multiple Systems No
Ownership & Value Chain Partners
Ownership Model Utility-Owned
Equity Owner 1 Long Island Power Authority
Cost & Performance
Performance Performance metrics not available
Benefits
Service Use Case Electric Energy Time Shift
Funding
Funding Source 1 Federal/National Office of Electricity and Reliability – RD&D
Department of Energy, Office of Electricity - Smart Grid Demonstration Program
$12496047
Export Data PDF

Print to PDF

You may use your computer system's built-in dialog to obtain a PDF of this page through the Print menu. Print this page, then choose Print to PDF or Save to PDF near the bottom of the dialog box.

Print and Save to PDF

Export Data

Thank you for using the Global Energy Storage Database. Please provide your e-mail address to download the data. Upon filling out the form you will receive an email with a link to the full data set you requested.

Suggest Update

Thank you for using the Global Energy Storage Database. Please provide the following information to help us research your update to this content.