Zagorsk PSP-1

Technology Type Open-loop Pumped Hydro Storage
Rated Power 1200000 kW
Duration at Rated Power (HH:MM) 0:15.00 / 0.00
URL More about Zagorsk PSP-1
The decision to build the country's first hydroelectric power plant in the town of Sergiev Posad district was adopted in 1974. The first two reversible pumped storage hydro Zagorskaya were put into operation in December, 1987. The last of the six reversible pump turbines were commissioned in 2000. Zagorsk-2 with a future installed capacity of 840 MW is currently being constructed adjacent to it.
This data has been validated by project staff through a review of publicly available information about the project, and verified by the project owner. Information is accurate as of 2016-04-29.
Project Status
Status Operational
Commissioning On 05.11.2003
Project Includes Multiple Systems No
Siting
Location

Sergiev Posad, Moscow Oblast
Russia

ISO/RTO N/A
Utility Type
Paired Grid Resource Transmission
Project Includes Multiple Systems No
Ownership & Value Chain Partners
Ownership Model Third-Party-Owned
Equity Owner 1 RusHydro
Cost & Performance
Performance Project annual generation : 1,932,000,000 kWh
Benefits
Service Use Case Electric Energy Time Shift
Electric Supply Capacity
Export Data PDF

Print to PDF

You may use your computer system's built-in dialog to obtain a PDF of this page through the Print menu. Print this page, then choose Print to PDF or Save to PDF near the bottom of the dialog box.

Print and Save to PDF

Export Data

Thank you for using the Global Energy Storage Database. Please provide your e-mail address to download the data. Upon filling out the form you will receive an email with a link to the full data set you requested.

Suggest Update

Thank you for using the Global Energy Storage Database. Please provide the following information to help us research your update to this content.