The facility has 4 units. The first unit was commissioned in 1990 and the last in 1998. It is operated by Gujarat State Electricity Corporation Limited (GSECL).

http://www.waterpowermagazine.com/features/featurepicking-up-the-pace/


Open-loop Pumped Hydro Storage


240,000