Kwp_i_photo
Kaheawa I Wind Project
Technology Type

Advanced Lead Acid Battery

Rated Power (kW)
1,500
Duration at Rated Power (HH:MM)
0:15
Description

Xtreme Power installed a 1.5MW Dynamic Power Resource (DPR) as a demonstration project to perform Ramp Control for 3MW of the 30MW Kaheawa Wind Farm in Hawaii. The project uses Xtreme's patented Dynamic Power Resource energy storage and power management system.

Project Status
Status

Operational

Commissioning On
Jul 01, 2009
Siting
Location
Maui , Hawaii
United States
ISO/RTO

N/A

Utility

Maui Electric Corporation

Utility Type

Investor Owned

Grid Interconnection

Transmission

Paired Grid Resource

Wind

Ownership &
Value Chain Partners
Ownership Model

Third-Party-Owned

Equity Owner 1

First Wind

Equity Owner 1 Percentage
100%
Energy Storage Technology Provider

Xtreme Power Inc.

Integrator Company

Xtreme Power Systems, LLC

Developer

First Wind

Cost & Performance
Performance
Performance metrics not available.
Benefits & Incentives
Benefit Stream 1

Renewables Capacity Firming

Benefit Stream 2

Ramping

Metadata
Record Created
2012-02-12 01:53 AM UTC
Last Updated
2012-06-08 09:51 PM UTC
 
Export_to_excel Export_to_pdf