Huizhou_pumped_storage_power_station
Huizhou Pumped Storage Power Station
This data is preliminary as we are still verifying the entry with the equity owner of the project. If you or someone you know is associated with this project and can provide confirmation of the existing data, or additional data, please email storage.exchange@strategen.com.
Technology Type

Open Loop Pumped Hydro Storage

Rated Power in kW
2,448,000
Description

The Huizhou Pumped Storage Power Station is a pumped storage hydroelectric power station near Huizhou in Guangdong province, China. It contains 8 pump-generators that total a 2,448 MW installed capacity. Initial units went online between 2007 and 2008,and the power station was complete on June 15, 2011.

The Guangdong power grid requires emergency reserve capacity of 5000MW. Guangzhou Pumped Storage can provide about 900MW.

Project Status
Status

Operational

Commissioning On
Jun 15, 2011
Siting
Location
Huizhou , Guangdong
China
ISO/RTO

N/A

Grid Interconnection

Transmission

Ownership &
Value Chain Partners
Ownership Model

Third-Party-Owned

Equity Owner 1

Guangdong Pumped Storage Power Company Limited

Energy Storage Technology Provider

Alstom

Power Electronics Provider

Geokon Instruments

Cost & Performance
Performance

Annual Generation: 4,500,000,000 kWh; Annual Consumption while Pumping: 6,003,000,000; Efficiency: 74.96%

Benefits
Service/Use Case 1

Electric Energy Time Shift

Service/Use Case 2

Electric Supply Reserve Capacity - Spinning

Service/Use Case 3

Frequency Regulation

Funding
RD&D Funding

No

Metadata
Record Created
2013-06-12 12:55 AM UTC
Last Updated
2013-11-29 11:53 PM UTC
 