Ucsdbyd

The University of San Diego installed 2.5 MW / 5 MWh of containerized batteries provided from energy storage technology provider BYD.

• 60% Funded with CPUC Self Generation Incentive Program (SGIP)
• 40% Co-funded by UCSD and BYD
• 2.5 MW/ 5 Mwhr energy storage complements UCSD’s 2.2 MW of campus PV and off peak CHP
• Competitive Solicitation, Turn Key Design/Build
• Awarded to BYD, Lithium-ion Iron-Phosphate battery
• Site Construction started May, 2015
• System Installation started June, 2015
• System Installation completed Sept. 2015


Lithium Iron Phosphate Battery


2,500

2:00.00