Department of Energy Logo
Sandia National Labs Logo

Čierny Váh Pumped Storage Power Plant

Technology Type Open-loop Pumped Hydro Storage
Rated Power 735160 kW
Duration at Rated Power (HH:MM) 0:15.00 / 0.00
URL More about Čierny Váh Pumped Storage Power Plant
The pumped storage hydro power plant (PSHPP) Čierny Váh is situated in the valley of the river Čierny Váh, approximately 10 km above its confluence with the Biely Váh River near the Kráľová Lehota municipality, which is a part of the Low Tatras National Park protected zone. It is a construction with daily water accumulation that participates in the functioning of the frequency regulation and of the distribution of electricity to the grid. This hydraulic structure consists of four parts: an upper and a lower reservoir, penstocks and a power station. The lower reservoir was created by means of damming up the valley of the Čierny Váh by a 375 m long dam. Its capacity is 5.1 million m3. The level fluctuates by 7.45 m between elevations 726.00 – 733.45 m. The upper reservoir of an irregular shape is situated between the valleys of the Biely Váh and the Čierny Váh. It has a maximum capacity of 3.7 million m3 of water and the level fluctuates by 25 m between the elevation points 1160 – 1135 m above sea level. The sealing of the slopes and of the bottom is provided by one layer of asphalt concrete sealing blanket with a surface of approximately 200,000 m2. Underneath the reservoir, there is an inspection tunnel that should collect the potential seepages from the reservoir bottom and slopes. The hydraulic connection of the upper and lower reservoir is ensured via three pressure penstocks which have an internal diameter of 3.8 m. In the valley, they split into pipes that transport the water to the two turbines and outlets of water from the two accumulation pumps. The maximum head between the upper and the lower reservoirs is 434 m. The lower reservoir dam includes also a power station with a control room. There are six pumping turbo aggregates installed that comprise a motor generator, a Francis turbine and an accumulation pump. When 6 accumulation pumps are in operation, it takes 8 hours to pump the water into the upper reservoir. Source: http://www.skcold.sk/priehrady/nova_databaza_priehrad/pve_cierny_vah/
This data has been validated by project staff through a review of publicly available information about the project, and verified by the project owner. Information is accurate as of 2016-04-29.
Project Status
Status Operational
Commissioning On DD.01.YYYY
Project Includes Multiple Systems No
Siting
Location

Vodná nádrz Čierny Váh, Liptov
Slovakia

ISO/RTO N/A
Utility Type
Paired Grid Resource Transmission
Project Includes Multiple Systems No
Ownership & Value Chain Partners
Ownership Model Third-Party-Owned
Equity Owner 1 Slovenské Elektrárne
Energy Storage Technology Provider CKD, Skoda
Cost & Performance
Performance Annual Generation: 370.8 GWh
Benefits
Service Use Case Electric Energy Time Shift
Electric Supply Capacity
Electric Supply Reserve Capacity - Spinning
Frequency Regulation
Voltage Support
Export Data PDF

Print to PDF

You may use your computer system's built-in dialog to obtain a PDF of this page through the Print menu. Print this page, then choose Print to PDF or Save to PDF near the bottom of the dialog box.

Print and Save to PDF

Export Data

Thank you for using the Global Energy Storage Database. Please provide your e-mail address to download the data. Upon filling out the form you will receive an email with a link to the full data set you requested.

Suggest Update

Thank you for using the Global Energy Storage Database. Please provide the following information to help us research your update to this content.